Afcons completed the 36-month project in record time of 22 months
EPC for 126km of the 302-km six-lane access-controlled expressway, which is India’s longest; 6 major bridges, including Ganga Bridge completed in just 18 months; 58 pedestrian underpasses, 4 rail over bridges, 8 flyovers, 29 minor bridges, 23 vehicular underpasses
Afcons used 2.5m diametre bored cast in-situ piles in marine environment for the first time
1 km railway bridge in JV with Ircon; One major bridge and six minor bridges
Fastest hill-road project in NHAI’s history; Afcons completed the job ahead of time
Four laning of NH-1A connecting Jammu and Udhampur. The highway that connects Jalandhar, Punjab, to Uri, J&K, passes through Pathankot, Jammu, Udhampur, Patnitop, Banihal, Srinagar and Uri
Primary entry point to Bahrain, the project has significantly reduced travel time from Saudi Arabia.
It was monitored by the Prime Minister’s Office
Construction of overpass from Shaikh Isa bin Salman Highway to Al Fateh Highway and tunnel from Shaikh Isa bin Salman
Bridge heading towards Shaikh Khalifa bin Salman Port & Hidd Industrial area
India’s longest railway bridge; Afcons completed the project in record time of 27 months
8-km bridge (4.62km elevated) from Idappalli to Vallarpadam, Kerala; 5 major/minor bridges
Afcons completed this prestigious and complex work well ahead of schedule
Construction of 235 m long bridge between Aldona and Corjeum village out of which 185m is cable stayed; foundation comprised 1m diameter cast in situ piles for piers, superstructure was with mild steel plate girders of 1200mm depth with concrete decking
One of the toughest bridge works undertaken in India, due to geological and engineering
considerations and first bridge designed for blast load. On completion, it will be world‘s tallest single-arch railway bridge
Construction of single arch railway bridge over river Chenab on the strategic railway line connecting
Baramulla to Udhampur
The Jewel of Creek Development is a prestigious project in the heart of Dubai featuring first ever double-decker tunnel in Dubai
Construction of roads and underpasses on the busy Baniyas Road and Itihad Road to provide access to the Jewel of Creek development, a landmark architectural masterpiece on the shores of Dubai Creek.
First of its kind project in Africa including first-ever flyovers built in the country
Construction, rehabilitation and widening of 91 km roads in Lusaka City, 29 km roads with dedicated bus lanes for Bus Rapid Transit (BRT) and improvement of 9 junctions along with 4 new flyovers