Skip to main content
Double Track BG Railway Bridge Mokama afcons project Kolkata Metro Rail Corporation Limited afcons project Nagpur Mumbai Samruddhi Expressway afcons project

Global

presence

In-house

engineering and planning

Strong

value engineering

Large

value projects

Known

for early completion

Rich experience

in the Greenfield Expressways

Average

project size INR 1500 Cr+

Experience

of working in extreme locations

In-house

capability to design and fabricate
superstructure launching systems

Strong

subcontracting and logistics team
Nagpur-Mumbai Super Communication Expressway afcons project
Agra-Lucknow <br/> Expressway Project Agra-Lucknow <br/> Expressway Project

Agra-Lucknow
Expressway Project

Afcons completed the 36-month project in record time of 22 months

Scope:

EPC for 126km of the 302-km six-lane access-controlled expressway, which is India’s longest; 6 major bridges, including Ganga Bridge completed in just 18 months; 58 pedestrian underpasses, 4 rail over bridges, 8 flyovers, 29 minor bridges, 23 vehicular underpasses

Client:
Uttar Pradesh Expressway Industrial Development Authority (UPEIDA)
Year of Completion:
2017

Agra-Lucknow Expressway Project

Bhairab Railway Bridge, <br/> Bangladesh Bhairab Railway Bridge, <br/> Bangladesh

Bhairab Railway Bridge,
Bangladesh

Afcons used 2.5m diametre bored cast in-situ piles in marine environment for the first time

Scope:

1 km railway bridge in JV with Ircon; One major bridge and six minor bridges

Client:
Ministry of Railways, Bangladesh
Year of Completion:
2016
Jammu Udhampur <br/> Highway Jammu Udhampur <br/> Highway

Jammu Udhampur
Highway

Fastest hill-road project in NHAI’s history; Afcons completed the job ahead of time

Scope:

Four laning of NH-1A connecting Jammu and Udhampur. The highway that connects Jalandhar, Punjab, to Uri, J&K, passes through Pathankot, Jammu, Udhampur, Patnitop, Banihal, Srinagar and Uri

Client:
National Highway Authority of India (NHAI)
Year of Completion:
2014

Jammu Udhampur Highway

Mina Salman <br/> Interchange, Bahrain Mina Salman <br/> Interchange, Bahrain

Mina Salman
Interchange, Bahrain

Primary entry point to Bahrain, the project has significantly reduced travel time from Saudi Arabia.
It was monitored by the Prime Minister’s Office

Scope:

Construction of overpass from Shaikh Isa bin Salman Highway to Al Fateh Highway and tunnel from Shaikh Isa bin Salman
Bridge heading towards Shaikh Khalifa bin Salman Port & Hidd Industrial area

Client:
Ministry of Works, Kingdom of Bahrain
Year of Completion:
2014

Mina Salman Interchange, Bahrain

Vallarpadam Railway <br/> Bridge, India Vallarpadam Railway <br/> Bridge, India

Vallarpadam Railway
Bridge, India

India’s longest railway bridge; Afcons completed the project in record time of 27 months

Scope:

8-km bridge (4.62km elevated) from Idappalli to Vallarpadam, Kerala; 5 major/minor bridges

Client:
Rail Vikas Nigam Ltd (RVNL)
Year of Completion:
2009
Cable stayed bridge <br/> across river Mapusa, Goa Cable stayed bridge <br/> across river Mapusa, Goa

Cable stayed bridge
across river Mapusa, Goa

Afcons completed this prestigious and complex work well ahead of schedule

Scope:

Construction of 235 m long bridge between Aldona and Corjeum village out of which 185m is cable stayed; foundation comprised 1m diameter cast in situ piles for piers, superstructure was with mild steel plate girders of 1200mm depth with concrete decking

Client:
Goa State Infrastructure Development Corporation Ltd
Chenab Railway <br/>Bridge, India Chenab Railway <br/>Bridge, India

Chenab Railway
Bridge, India

One of the toughest bridge works undertaken in India, due to geological and engineering
considerations and first bridge designed for blast load. On completion, it will be world‘s tallest single-arch railway bridge

Scope:

Construction of single arch railway bridge over river Chenab on the strategic railway line connecting
Baramulla to Udhampur

Client:
Konkan Railway Corporation Ltd (KRCL)
Year of Completion:
Ongoing

Chenab Railway Bridge, India

Jewel of Creek Development, Dubai Jewel of Creek Development, Dubai

Jewel of Creek Development, Dubai

The Jewel of Creek Development is a prestigious project in the heart of Dubai featuring first ever double-decker tunnel in Dubai

Scope:

Construction of roads and underpasses on the busy Baniyas Road and Itihad Road to provide access to the Jewel of Creek development, a landmark architectural masterpiece on the shores of Dubai Creek.

Client:
Roads & Transport Authority (RTA), UAE
Year of Completion:
2020

Jewel of Creek Development, Dubai

Jewel of Creek Development, Dubai

Lusaka City Roads Decongestion Project, Zambia Lusaka City Roads Decongestion Project, Zambia

Lusaka City Roads Decongestion Project, Zambia

First of its kind project in Africa including first-ever flyovers built in the country

Scope:

Construction, rehabilitation and widening of 91 km roads in Lusaka City, 29 km roads with dedicated bus lanes for Bus Rapid Transit (BRT) and improvement of 9 junctions along with 4 new flyovers

Client:
Ministry of Local Government and Housing, Zambia
Year of Completion:
2021
Testimonials
B S Rawat
R P Singh
Huda Fakhroo
E Sreedharan
Mattar Al Tayer
Pradeep Gaur
Mohammad Sleiman
Charles Banda
Yaw Owusu
Kwaku Asante Boateng
David MacKenzie, Senior Technical Director, COWI UK Limited

more videos

Hindu Hrudaysamrat Balasaheb Thackeray Maharashtra Samruddhi Mahamarg Package-2
Al Awir Road Project
Agra Lucknow Expressway Project
Jammu-Udhampur Highway Project
Mina Salman Interchange – Bahrain
Ganga Bridge
Entrances To The Jewel Of The Creek
Fast Track To Growth - Tema-Mpakadan Railway Project, Ghana (4K)
Lusaka City Decongestion Project, Zambia
Buzi Bridge Inauguration, Mozambique

Afcons fights Covid 19