Skip to main content
Water Pipeline Lake Victoria supply scheme afcons Udhampur-Srinagar-Baramulla Rail Link (USBRL) project afcons Bauxite Material Handling System Guinea afcons

12+

tunnels & Hydro works

Micro-managing

of highest degree

Quality

construction of global standards

Extreme

locations

Stability

& sustainability

Range

of world-class JV partners

Longest

highway tunnel at 10,000ft 

Well-equipped

technical team

Global

reach

Multiple

tunnels in J&K

Successful

foray into dams and irrigation segment

Contributing

significantly for the ambitious Udhampur Srinagar Baramulla Rail Link (USBRL) project

Complex

projects in extreme geographical/climatic conditions
Lusaka City Decongestion Project Zambia afcons
Kol Dam Hydro Electric Project (4X200 MW), Himachal Pradesh, India Kol Dam Hydro Electric Project (4X200 MW), Himachal Pradesh, India

Kol Dam Hydro Electric Project (4X200 MW), Himachal Pradesh, India

The project utilised a surface drop of 140m 

Scope:

163m rock fill dam, spillway, diversion structures, desilting arrangement, surface power house with a capacity of 800MW (2x400 MW). 

Client:
National Thermal Power Corporation Ltd (NTPC)
Year of Completion:
Substantial completion
Annaram Barrage Project, Telangana, India Annaram Barrage Project, Telangana, India

Annaram Barrage Project, Telangana, India

In its maiden entry into the dam/barrage segment, Afcons achieved a rare distinction of over 1 lakh cum concrete pumping in a month, for four months in a row in this project
The company set another benchmark when it placed 4300 cum of concrete in a single day

Scope:

Construction of 1270m long barrage across River Godavari with 66 radial gates of size 15mX12.3m Construction of hoisting arrangements including formation of guide bunds on either side of barrage, etc.

Client:
I & CAD department, Government of Telangana
Year of Completion:
Ongoing

Annaram Barrage Project, Telangana, India

Water Supply Pipeline Project, Tanzania Water Supply Pipeline Project, Tanzania

Water Supply Pipeline Project, Tanzania

About 500km pipeline (dia. 900 – 75mm) to carry fresh drinking water comprising gravity transmission main and distribution network of MS/DI/UPVC pipelines

Scope:

Extension of the Lake Victoria pipeline water supply project to Tabora, Nzega, and, Igunga towns including pipeline work, storage tanks, electro-mechanical and electrical and instrumentation works, etc. 

Client:
Ministry of Water & Irrigation, Tanzania
Year of Completion:
Ongoing
Atal Tunnel, Rohtang, Himachal Pradesh, India Atal Tunnel, Rohtang, Himachal Pradesh, India

Atal Tunnel, Rohtang, Himachal Pradesh, India

World’s longest highway tunnel above 10,000ft. Once ready, it will reduce distance between Kulu and Lahaul by 48 kms and travel time by four hours

Scope:

Construction of 8.8-km dual lane single bore highway tunnel, across Rohtang Pass in JV with Strabag AG, Austria

Client:
Border Roads Organisation (BRO)
Year of Completion:
Ongoing
North portal North portal

North portal

South portal South portal

South portal

Inside tunnel Inside tunnel

Inside tunnel

Atal Tunnel, Rohtang, Himachal Pradesh, India

Rohtang Tunnel

B.G. Single Line Tunnels on Katra-Laole Section of USBRL Project, J&K, India B.G. Single Line Tunnels on Katra-Laole Section of USBRL Project, J&K, India

B.G. Single Line Tunnels on Katra-Laole Section of USBRL Project, J&K, India

Afcons is the first Indian company to daylight tunnels in this section

Scope:

Afcons is building five Broad Gauge Single Line Tunnels as part of the ambitious Udhampur Srinagar Baramulla Rail Link Project in tough terrain

Client:
Konkan Railway Corporation Ltd (KRCL)
Year of Completion:
Ongoing
Tunnels 1 & 2: T74R-A and T74R-B Tunnel, J&K, India Tunnels 1 & 2: T74R-A and T74R-B Tunnel, J&K, India

Tunnels 1 & 2: T74R-A and T74R-B Tunnel, J&K, India

Scope:

Construction of Tunnel T74-R work from Adit between km 127/660 to km 130/950 (Length 3290m), and, at South portal from km 125/310 to km 127/660 (T74R-B) on Dharam - Qazigund section of USBRL project

Client:
IRCON International Ltd
Year of Completion:
Ongoing
Tunnel 3: KRCL Tunnel, J&K, India Tunnel 3: KRCL Tunnel, J&K, India

Tunnel 3: KRCL Tunnel, J&K, India

Scope:

Construction of single line tunnel on Katra-Laole section of USRBL Project

Client:
Konkan Railway Corporation Ltd (KRCL)
Year of Completion:
Ongoing

Tunnel 3: KRCL Tunnel, J&K, India

Tunnel 4: Tunnel T49, J&K, India Tunnel 4: Tunnel T49, J&K, India

Tunnel 4: Tunnel T49, J&K, India

Scope:

Construction of Tunnel T49 (Part Tunnel) and side Adits, Tunnel T50, Bridge 4, Bridge 5 and Earthworks at Arpinchala (between Km 116.600 & 125.000 approx.) on Dharam - Qazigund Section of Udhampur-Srinagar-Baramulla New BG Railway Line Project

Client:
Ircon International Ltd
Year of Completion:
Ongoing
Testimonials
Rajesh K
N M Chandarana
Binaya S. Pradhan
Vijay Khanduja
The Promise Fulfilled

more videos

Rohtang Tunnel
KRCL Tunnel – Sangaldan
Annaram Barrage – Defying Gravity
Pushing Boundaries | Pandoh bypass - Takoli highway
Water Supply Project in Chalinze, Tanzania
Water For Power - Deka Water Pipeline Project, Zimbabwe

Afcons fights Covid 19