
| Client | : | Madras Atomic Power Project |
| Consultant |
: | - |
| Year of Completion | : | 1980 |
| Location | : | Kalpakkam, Tamilnadu, India |

| Project Brief | |
| Project involved construction of | |
| India’s 3 rd Atomic Power Plant (200 mW) | |
| For the cooling system of the reactor 1,270 cusecs of water is required to be drawn from the sea through the intake structure which was constructed by AFCONS. Duw to difficult site conditions , novel constriction techniques have been used for the construction of this construction. | |
|
