Trestle bridge, Visakhapatnam
| Client |
: |
Hindustan Petroleum Corporation Ltd. , India |
Consultant
|
: |
Engineers India Ltd. |
| Year of Completion |
: |
1985 |
| Location |
: |
Visakhapatnam, Andhra Pradesh, India |
| Project Brief |
 |
AFCONS have successfully completed laying 400 m of 36" dia. submarine oil pipeline to a depth of 25 m below high water level in the entrance channel of Visakhapatnam Harbour. Along with it other connected works such as piled trestle bridge to carry the pipeline to shore and all other connected pipe works including installation of marine unloading arms on the oil berth were completed. |
| |
|