Modernisation of Marine Oil Berths J1, J2 & J3
Client : Mumbai Port Trust, Mumbai, India
Consultant
: Kvaerner E & C Singapore Pte. Ltd.
Year of Completion : 2004
Location : Mumbai, Maharashtra, India
Modernisation of Marine Oil Berths J1, J2 & J3
Project Brief
Pre Engineering Survey & Soil Investigations, residual engineering based on the investigation, preparation of all necessary engineering construction drawing & documents.
Replacement of the common user service of oil pipelines from the Jawahar Dweep manifold to the MOT berths Jl, J2 and J3 and associated structural, electrical instrumentation and fire protection facilities for onshore and marine areas works which includes necessary demolition of existing trestle and construction of a new road cum pipe bund and trestle to the Jawahar Dweep berths J1,J2 and J3 to accommodate the new lines.
Replacement of the common user utility pipelines.
Dismantling and reconstruction of the pier head of each of the three berths J1.J2 and J3. Installation of 13nos. of loading Arms at each of the three berths and hooking of the new trunk oil pipelines to the new service oil pipelines via the new manifold.
Construction of new seawater pump house and pumps near existing fire pump house at jetty J4 trestle.
The job was in fact a great challenge, because during the construction of any one berth the other two berth had to be free and the construction activities had to be carried out in proximity of Tanker Ships were loading and unloading operations of crude oil and various refined products was in continues operation. Hence AFCONS had to adhere very strictly to all safety concerns while carrying out the construction activities.