| Client | : | Petronet LNG Limited |
| Consultant |
: | IHI Corporation, Japan |
| Year of Completion | : | Ongoing |
| Location | : | Puthuvypeen SEZ, Kerala, India |

| Project Brief | |
| The plot of 835 m x 400 m to be filled, leveled and compacted from a present level of (+)0.62 m above MSL to a final finished grade level of (+)3.00 m above MSL. | |
Constructing Access Road from terminal main entrance upto the LNG Storage tank Area. |
|
| Constructing Rubble Mound Bund at the southwest corner of the terminal. | |
Construction of 490 m long Rock Bund at South Side of the compound wall, outside the plot area and filling with dredged sand the area between compound wall and the rock bund. |
|
Filling work for road length about 140 m, connecting LNG Terminal Main Gate with CoPT Road. |