| Client | : | Chemplast Sanmar Ltd. |
| Consultant |
: | Fichtner Engineering Pvt. Ltd. |
| Year of Completion | : | 2009 |
| Location | : | Tamilnadu, India |

| Project Brief | |
| Design and Construction of Marine terminal Facility & Pipeline works will be used to import the VCM (Vinyl Chloride Monomer). | |
|
The work comprised of Offshore Jetty and other civil works along with service platform breasting dolphin mooring dolphin walkways, boat landing facility fire water pump house submarine pipeline – insulated pipe-in-pipe approximately 1.025 km in length onshore pipeline – insulated pipe-in-pipe approximately 2.826 km in length installation of loading arms, electrical works, fire-fighting system and navigation and communication system. The EPCC of Marine Terminal Facility scope includes Jetty Civil Works Pipe Line Works |
|