Crude Unloading Jetty, Nagapattinam.
| Client |
: |
Chennai Petoleum Corporation Ltd. |
Consultant
|
: |
Engineers India Ltd. |
| Year of Completion |
: |
2003 |
| Location |
: |
Nagapattinam, Tamilnadu, India |
| Project Brief |
 |
The work comprised of construction of 1100m long jetty alongwith pipelines, crude pipelines, firefighting pipelines, and approach road. |
 |
The foundation was combination of RCC cast in-situ piles (up to bent 33) and steel piles (bent 34 to 67 including berthing dolphins and mooring dolphins). Steel piles of dia. 1218mm and 1500mm weighing 30/50 MT respectively, were driven by Junttan – HHK 28 hydraulic hammer with the help of RB71 crane mounted on indigenously developed jack up platform. |
| |
|